Jackson Pond Expansion

Village of Villa Park, IL

Completed July 2023

The Jackson Pond Middle School Pond Expansion project improved stormwater management by expanding an existing detention basin and upgrading the surrounding drainage infrastructure. The work enhanced both inflow and outflow performance, increased flood storage capacity, and improved system resilience.

Scope included earthwork to enlarge the pond, installation of a new large-diameter storm sewer from Jackson Street, modifications to the outlet structure and overflow swale, and restoration of impacted pavement and sidewalks. The project also involved full site layout, traffic control, and erosion protection throughout construction.

Constructed by Earthwerks & Control Point Engineering | Designed by V3 Companies