Hickory hills Basin

Hickory Hills, IL

Completed October 2024

The Hickory Hills Basin project expanded an existing stormwater detention basin located next to a critical drinking water storage tank and pumping facility. The project included regrading and basin expansion to improve flood control, along with the relocation of a sanitary sewer main to accommodate the new layout.

Constructed by Earthwerks & Control Point Engineering | Designed by Robinson Engineering.

Previous
Previous

Naperville Brighton Pond

Next
Next

Carpentersville Riverfront Park